|
|
||||||
|
#1
|
|
|
|
|
For the last week or two I've been passing OOC and seeing a 332 (Heathrow
Express) vinyled up with orange doors etc., into Heathrow Connect livery. Any ideas why? The half hourly Heathrow Connect service only seems to require two units in operation at any one time (from observation only - I stand to be corrected), with the other two parked up at OOC. Any ideas why they would need a fifth unit, or where/why one of the new 360/2s would be cascaded? Just seems a bit odd! (For those outside London, Heathrow Connect is a new (since June) stopping service between Paddington/Ealing and Heathrow, a half hourly service using 360/2s in addition to the Heathrow Express service which remains non-stop at 15min intervals using 332s.) |
|
|
|
#2
|
|
|
|
|
Ian Harper wrote:
> For the last week or two I've been passing OOC and seeing a 332 (Heathrow > Express) vinyled up with orange doors etc., into Heathrow Connect livery. > Any ideas why? It is a reserve unit for use until the next unit is delivered and all others are in 5car formation. |
|
#3
|
|
|
|
|
"Ian Harper" <i> wrote
> > The half hourly Heathrow Connect service only seems to require two units in > operation at any one time (from observation only - I stand to be corrected), > with the other two parked up at OOC. Any ideas why they would need a fifth > unit, or where/why one of the new 360/2s would be cascaded? > AIUI it does require 3 units. To make do with two would involve a 3 minute turnround at Heathrow, which is insufficient for the train to run forward into the headshunt and back into the other platform. Peter |
|
#4
|
|
|
|
|
Ian Harper wrote:
> The half hourly Heathrow Connect service only seems to require two units in > operation at any one time (from observation only - I stand to be corrected), My travels have yielded 3 units each time I have done it. It must be more than 2 units as the running time from Paddington to Heathrow is 25 min but the trains go to signal 342 (see HAFAS) taking overall 31 minutes: London Paddington 12:08 Ealing Broadway 12:15 West Ealing 12:18 Hanwell 12:20 Southall 12:23 Hayes + Harlington 12:26 Heathrow Terminal 1 12:33 Heathrow Signal 342 12:39 Can not run a service at 30 minute intervals with 2 units if the run time is 31 minutes. > with the other two parked up at OOC. Any ideas why they would need a fifth > unit, or where/why one of the new 360/2s would be cascaded? Is it not a plan at some point in the future for Connect to go to a higher frequency like every 15 mins when the expansion works are complete ? That would seem to me to need 4 units. |
|
#5
|
|
|
|
|
On 31 Jul 2005 11:45:39 -0700, "D7666" <d7666> wrote:
>> The half hourly Heathrow Connect service only seems to require two units in >> operation at any one time (from observation only - I stand to be corrected), > >My travels have yielded 3 units each time I have done it. > >> with the other two parked up at OOC. Any ideas why they would need a fifth >> unit, or where/why one of the new 360/2s would be cascaded? > >Is it not a plan at some point in the future for Connect to go to a >higher frequency like every 15 mins when the expansion works are >complete ? > >That would seem to me to need 4 units. ICBW but I believe the plan is that once T5 opens, HX will be diverted to T5 and HC will run to T4. HC trains would continue to run at a half-hourly frequency, but would double-back between T123 and T4 to maintain a 15-minute frequency between those stations. IOW the stopping pattern would be as follows: Paddington (...) H&H T123 T4 T123 T4 T123 H&H (...) Paddington |
|
#6
|
|
|
|
|
asdf wrote:
> >higher frequency like every 15 mins when the expansion works are > >complete ? > ICBW but I believe the plan is that once T5 opens, HX will be diverted > to T5 and HC will run to T4. HC trains would continue to run at a > half-hourly frequency, but would double-back between T123 and T4 to > maintain a 15-minute frequency between those stations. That might be what I was thinking of, I knew 15 mins came into it somewhere. |
|
#7
|
|
|
|
|
DERWENT 332 Heathrow Express to Heathrow Connect?
Sun, 31 Jul 2005 19:21:42 +0100, "Ian Harper" <i> >For the last week or two I've been passing OOC and seeing a 332 (Heathrow >Express) vinyled up with orange doors etc., into Heathrow Connect livery. > >Any ideas why? Spare set in case 2 360s are kaput. Which one is it? > >The half hourly Heathrow Connect service only seems to require two units in >operation at any one time (from observation only - I stand to be corrected), >with the other two parked up at OOC. Any ideas why they would need a fifth >unit, or where/why one of the new 360/2s would be cascaded? There are 3 360/2 diagrams, the reversal at Heathrow takes to long, meaning they can't run with just two diagrams. PRAR |
|
#8
|
|
|
|
|
"PRAR" <prar> wrote in message
news:18j8 > DERWENT 332 Heathrow Express to Heathrow Connect? > Sun, 31 Jul 2005 19:21:42 +0100, "Ian Harper" <i> > >>For the last week or two I've been passing OOC and seeing a 332 (Heathrow >>Express) vinyled up with orange doors etc., into Heathrow Connect livery. >> >>Any ideas why? > > Spare set in case 2 360s are kaput. Which one is it? I am told it's 332001 |
|
#9
|
|
|
|
|
DERWENT Re: 332 Heathrow Express to Heathrow Connect?
Sun, 31 Jul 2005 21:39:47 GMT, "Rich Mackin" <rich.mackin> >"PRAR" <prar> wrote in message >news:18j8 >> DERWENT 332 Heathrow Express to Heathrow Connect? >> Sun, 31 Jul 2005 19:21:42 +0100, "Ian Harper" <i> >> >>>For the last week or two I've been passing OOC and seeing a 332 (Heathrow >>>Express) vinyled up with orange doors etc., into Heathrow Connect livery. >>> >>>Any ideas why? >> >> Spare set in case 2 360s are kaput. Which one is it? > >I am told it's 332001 Cheers, 360202/3/4 were working today. PRAR |
|
|
| Similar Threads | |
| BAA Heathrow CONnect BAA is well known for its inability to run a simple out and back service, but they do keep on insisting on proving it. This is what was heard over the tannoy at Hayes and... |
|
| Travelcards on Heathrow Express/Connect during LU closure The first time I've seen this happen on a scheduled basis: when the District and Piccadilly lines are closed between Acton and Earls Court for scheduled engineering works... |
|
| Heathrow Connect Hi On the LDB for Paddington, it show the Heathrow Connect trains as going to HTRW342 Seems a bit strange! |
|
| Heathrow Connect when? Is there any news about when this service will start? |
|
|
All times are GMT. The time now is 06:42. | Privacy Policy
|